Compressed Air, Nitrogen and Vacuum Systems Maintenance
Comprador: University of Exeter
750.000 GBP
Abierta
Plazo de presentación: 21 dic 2026, 12:00 UTC
| Estado | Adjudicada |
|---|---|
| Importe estimado | 39.836 GBP |
| Plazo de presentación | Plazo no publicado |
| Publicado | 12 nov 2026 |
| Comprador | University of Exeter |
| País | Reino Unido · Exeter |
| Código CPV | 50712000 |
| Fuente | Find a Tender ↗ |
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
| Adjudicatario / ganador | Número de registro / LEI | País | Importe adjudicado | Fecha de adjudicación |
|---|---|---|---|---|
| Intoheat Ltd 3 Oaktree Place, Manaton Close, Matford Business Park, Exeter, EX2 8WA exeter@intoheat.co.uk | GB-PPON: PNXR-5864-VJBN | Reino Unido | 39.836 GBP | 17 oct 2026 |
Comprador: University of Exeter
750.000 GBP
Abierta
Plazo de presentación: 21 dic 2026, 12:00 UTC
Comprador: APEX HOUSING ASSOCIATION
Importe no publicado
Abierta
Plazo de presentación: 11 ene 2027, 14:00 UTC
Comprador: Belfast City Council
600.000 GBP
Abierta
Plazo de presentación: 15 ene 2027, 12:00 UTC
Comprador: Centre Intercommunal d'Action Sociale (Cias)
200.000 €
Abierta
Plazo de presentación: 14 dic 2026, 15:00 UTC
Comprador: Southern Housing
11.660.000 GBP
Abierta
Plazo de presentación: 6 ene 2027, 17:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
Supply, deliver and install 1no Daikin VAM 1500J c/w external enclosure located as per the design intend drawing. Ventilation system design to deliver 400 L/S based upon an occupancy of 50 at 8 L/S per person. Supply, deliver & install 2no 1500mm long attenuators on the supply air and return air Supply, deliver and install 4no 250mm 900mm long attenuators fixed to the exhaust and fresh air connections on the VAM. Supply and install 2no 250mm 1phase 3kw inline electric heater battery to the fresh air inlets onto the VAM unit Supply and install galvanised ductwork system generally as per design intent drawing, including big foot frame for Daikin VAM unit and external ductwork. Installation of return air grille and up to 50no 65mm black stainless steel louvred vents as below. Design, supply and install BMS control wiring to VAM unit and new occupancy sensor, connected to the existing BMS system. Update site system and graphics to operate new ventilation system based upon CO2/Temp & occupancy. Supply and install new power supplies to the VAM unit and 2no inline electric heater battery’s. Connection made to existing distribution board. Thermally insulate external ductwork and clad with black venture clad