Ionad Eilean nan Òige - Phase 3
Comprador: Comann Eachdraidh Eirisgeidh
3.000.000 GBP
Abierta
Plazo de presentación: 21 dic 2026, 12:00 UTC
| Estado | Adjudicada |
|---|---|
| Importe estimado | 147.000.000 GBP |
| Plazo de presentación | Plazo no publicado |
| Publicado | 9 nov 2026 |
| Comprador | Nuclear Restoration Services Limited |
| País | Reino Unido · Warrington |
| Código CPV | 45111000, 42410000, 42416130, 42418000, 45111100, 45111300, 45222110, 45113000, 90650000, 79723000, 71312000, 45262650, 71313400, 42414100 |
| Fuente | Find a Tender ↗ |
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
| Adjudicatario / ganador | Número de registro / LEI | País | Importe adjudicado | Fecha de adjudicación |
|---|---|---|---|---|
| Aureos Highways Limited 2nd Floor 1 Lindsey Street, London, EC1A 9HP | GB-COH: 14882566 | Reino Unido | 147.000.000 GBP | 23 oct 2026 |
Comprador: Comann Eachdraidh Eirisgeidh
3.000.000 GBP
Abierta
Plazo de presentación: 21 dic 2026, 12:00 UTC
Comprador: Ipswich Borough Council
33.700.000 GBP
Abierta
Plazo de presentación: 14 dic 2026, 11:00 UTC
Comprador: Perth & Kinross Council
4.700.000 GBP
Abierta
Plazo de presentación: 7 ene 2027, 12:00 UTC
Comprador: Golding Homes
21.000.000 GBP
Abierta
Plazo de presentación: 4 dic 2026, 17:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
Removal of eight boilers and ancillary equipment, including demolition of buildings and safe removal of hazards such as asbestos containing materials. See full description and Scope document for full details.
Dungeness ‘A’ is a redundant nuclear power station located on the Romney Marsh in Kent. The power station ceased generation in 2006 and is currently undergoing decommissioning. The scope of works is for the Contractor to undertake the role of “Principal Contractor” for the safe removal of all hazards including Asbestos Containing Materials (ACM’s), soft stripping internal fixtures, fittings & linings and removal of the Boilers, by pass ducts, main gas duct sections, suitable laydown and weatherproof storage. The safe demolition of the buildings adjoining the east and west faces of the reactor buildings of the Dungeness A Site, noting the Blower Halls and Central Control Block are reduced to slab level with other buildings reduced as stated in the scope of works and in accordance with BS6187:2011 Code of Practice for Full and Partial Demolition (Ref. 16.4.1). To provide some idea of scale, Dungeness has eight boilers which will require removal and laydown. These are estimated at 7m in diameter and 21m long, they weigh approximately 700 tonnes each. Approximately 30% of the building structures currently on Site will be removed by the contract. The Employer will apply for any necessary planning permissions and carry out any activities necessary to obtain the Planning Approval. The Contractor is to provide all management, documentation, labour, plant, equipment, and materials to remove the hazards, de-plant all equipment, lifting and removal of the Boilers, by pass ducts, main gas duct sections, suitable laydown and weatherproof storage, demolition of the buildings and make good weatherproof of remaining structures including site remediation. The scope of this project includes the preparation and execution of all necessary investigation work such as ground, geological, ordnance, camera, flow surveys, etc. necessary to complete the scope of works.