Construction of 12 residential units (3 houses and 9 flats) at Maple Place redevelopment, Eastleigh
Comprador: Eastleigh Borough Council
3.000.000 GBP
Abierta
Plazo de presentación: 11 dic 2026, 12:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
Boston Borough Council, (the Authority) are undertaking a Preliminary Market Engagement (PME) exercise to inform the future procurement of a construction works contractor to deliver a single storey link corridor extension and associated works at an existing leisure centre known as Geoff Moulder Leisure Centre in Boston, Lincolnshire.
The work will comprise of sub-structure (piled foundations & floor slab) brick and blockwork super structure, flat roof and associated windows and doors. The corridor will be fitted out and comprise a basic M&E package. Associated works will include some internal remodelling and upgrade to an existing gym and spa area. The proposed link corridor and associated work forms part of a larger project, some elements of which are already commissioned and are on site at the time of writing.
Comprador: Eastleigh Borough Council
3.000.000 GBP
Abierta
Plazo de presentación: 11 dic 2026, 12:00 UTC
Comprador: Powys County Council
4.100.000 GBP
Abierta
Plazo de presentación: 15 ene 2027, 12:00 UTC
Comprador: Barcud Shared Services
34.213.333,36 GBP
Abierta
Plazo de presentación: 7 dic 2026, 12:00 UTC
Comprador: Golding Homes
21.000.000 GBP
Abierta
Plazo de presentación: 20 nov 2026, 13:00 UTC
Comprador: Wymering Manor Trust
Importe no publicado
Abierta
Plazo de presentación: 2 dic 2026, 00:00 UTC