Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Comprador: Afar Region RPCU
Importe no publicado
Abierta
Plazo de presentación: 20 nov 2026
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
A key objective of the project is to remove the last remaining asbestos from our Oban Depot. It’s believed that there is asbestos under the parapet coping stones. These large coping stones have to be carefully lifted to remove the asbestos from the underside. A full asbestos demolition survey is to be carried out at project commencement to identify all asbestos containing materials. The stone copes will be reset in their previous locations.
The existing roofing screed is to be fully stripped. Any defects to the existing substrate shall be repaired as necessary. A new waterproof/ non-slip coating will be applied over the substrate.
A new handrail is to be fabricated and installed around the inside face of the parapet.
A new aluminium step structure is to be fabricated and installed to allow access from the external kitchen door down on to the roof space.
Comprador: Afar Region RPCU
Importe no publicado
Abierta
Plazo de presentación: 20 nov 2026
Comprador: Cross River State SPIN
Importe no publicado
Abierta
Plazo de presentación: 30 nov 2026
Comprador: Project Management Unit, School Education Department, Government of Balochistan
Importe no publicado
Abierta
Plazo de presentación: 23 nov 2026
Comprador: Project Management Unit, School Education Department, Government of Balochistan
Importe no publicado
Abierta
Plazo de presentación: 24 nov 2026
Comprador: Amhara Urban Development and Infrastructure Bureau
Importe no publicado
Abierta
Plazo de presentación: 18 nov 2026