Construction of 12 residential units (3 houses and 9 flats) at Maple Place redevelopment, Eastleigh
Comprador: Eastleigh Borough Council
3.000.000 GBP
Abierta
Plazo de presentación: 11 dic 2026, 12:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
Forestry England is planning to refurbish Lodge Farm Cottage so it is fit to live in and can be rented out. We expect the work to cover general building, heating and plumbing, electrical and external works. The contractor we appoint would coordinate the works and give us the completion documents.
Working is detailed in the attached outline scope but would include:-
• Strip out the inside, clear the site and protect the existing building.
• New kitchen and bathroom, with the plumbing and electrical changes that go with them.
• New external oil boiler, changes to the heating system, a new hot water cylinder and the pipework.
• Plaster repairs, better insulation, decorating inside and minor carpentry.
• Electrical testing and certificates, lighting and extra power.
• Drainage and groundworks outside, lime pointing, repairs to the outhouse and a new well cover.
• Site welfare, security and waste removal, risk assessments and method statements, testing and commissioning, and handover information.
Comprador: Eastleigh Borough Council
3.000.000 GBP
Abierta
Plazo de presentación: 11 dic 2026, 12:00 UTC
Comprador: Powys County Council
4.100.000 GBP
Abierta
Plazo de presentación: 15 ene 2027, 12:00 UTC
Comprador: Barcud Shared Services
34.213.333,36 GBP
Abierta
Plazo de presentación: 7 dic 2026, 12:00 UTC
Comprador: Golding Homes
21.000.000 GBP
Abierta
Plazo de presentación: 20 nov 2026, 13:00 UTC
Comprador: Wymering Manor Trust
Importe no publicado
Abierta
Plazo de presentación: 2 dic 2026, 00:00 UTC