CA18723 - Multidisciplinary Architectural and Design Team Services
Comprador: BMet College
150.000 GBP
Abierta
Plazo de presentación: 11 dic 2026, 12:00 UTC
| Estado | Adjudicada |
|---|---|
| Importe estimado | 299.900 GBP |
| Plazo de presentación | 30 oct 2026, 12:00 UTC |
| Publicado | 10 nov 2026 |
| Comprador | MINING REMEDIATION AUTHORITY |
| País | Reino Unido · MANSFIELD |
| Código CPV | 71530000 |
| Fuente | UK Contracts Finder ↗ |
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
| Adjudicatario / ganador | Número de registro / LEI | País | Importe adjudicado | Fecha de adjudicación |
|---|---|---|---|---|
| Slr Consulting Ltd Brockhill Court, B97 6RB | GB-COH: 03880506 | Reino Unido | 299.900 GBP | 30 oct 2026 |
Comprador: BMet College
150.000 GBP
Abierta
Plazo de presentación: 11 dic 2026, 12:00 UTC
Comprador: London Borough of Haringey
210.000 GBP
Abierta
Plazo de presentación: 11 dic 2026
Comprador: Environment Agency
49.995 GBP
Abierta
Plazo de presentación: 18 dic 2026, 17:30 UTC
Comprador: NOREADE SIDEN-SIAN
Importe no publicado
Abierta
Plazo de presentación: 8 ene 2027, 12:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
This notice is intended to inform that a call off from a Framework has taken place.
The Coalsnaughton Incident requires multidisciplinary engineering input across structural, geotechnical, mining and geological matters. WSP is undertaking significant elements of the technical work and engineering development for Phase 2 under separate commissions approved through the MRA Engineering Services Framework.
It is considered appropriate for the MRA to obtain independent technical assurance of key elements of this work. The appointment of SLR provides additional specialist challenge and advice to support the MRA in understanding the technical evidence presented, identifying material gaps or concerns and making informed decisions as the project progresses.
The scope includes:
• review of structural inspection reports relating to properties identified for demolition;
• technical review of proposed protection and demolition works;
• review and interpretation of available site characterisation information;
• engagement with BGS;
• review of relevant WSP technical information and deliverables;
• participation in technical and project meetings; and
• ongoing multidisciplinary technical advice.
The commission is deliberately structured as an assurance and advisory role. SLR will not replace the responsibilities of WSP or other designers and consultants, nor will they make decisions on behalf of the MRA.