SprosRadar
Ausschreibungen finden
Tenders Electronic Daily (TED) · 806569-2026

77.25.XX Bodin Sixth form college ventilation such as building wing K

Eckdaten (Key Facts)

StatusOffen
Geschätzter Wert10.000.000 NOK
Angebotsfrist11. Dez. 2026, 11:00 UTC
Veröffentlicht19. Nov. 2026
AuftraggeberSweco Norge AS (Hovedenhet)
LandNorwegen · OSLO
CPV-Code45331210, 42520000, 45000000
QuelleTenders Electronic Daily (TED) ↗
Amtliche Bekanntmachung öffnen

Schwellenwerte, Fristen & Benchmarks prüfen

Geprüft:

Die amtliche Bekanntmachung ist maßgeblich. Status und Bedingungen können sich nach der Erfassung ändern.

Beschreibung

Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G.Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27.The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32. 1st floor. wing K:• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/heating/lighting. Cabling towards central processing system. 2nd floor wing K • Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.• Electrical work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.3 floor. wing K• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.•Technical room 1 floor. Wing K, 2 aggregates are to be renovated and delivered with a new automation for control from the control system. Something is altered on the intake channel system001. On all 3 aggregates, parts of the chassi internal cover shall be covered with new bottom plates. The joint intake for all aggregates is to be altered.

Lose

  1. 77.25.XX Bodin Sixth form college ventilation such as building wing K

    Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G.Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27.The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32. 1st floor. wing K:• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/heating/lighting. Cabling towards central processing system. 2nd floor wing K • Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.• Electrical work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.3 floor. wing K• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.•Technical room 1 floor. Wing K, 2 aggregates are

    10.000.000 NOK

Öffentliche Geschäftskontakte

frode.sorensen@sweco.no

+47 67128000

Geprüft: