C470012 - Maintenance and Servicing of Automatic Doors
Auftraggeber: MHRA
70.000 £
Offen
Angebotsfrist: 18. Dez. 2026, 10:00 UTC
| Status | Quelle prüfen |
|---|---|
| Geschätzter Wert | Wert nicht veröffentlicht |
| Angebotsfrist | Frist nicht veröffentlicht |
| Veröffentlicht | 12. Nov. 2026 |
| Auftraggeber | Fingrid Oyj |
| Land | Finnland · Helsinki |
| CPV-Code | 50531000 |
| Quelle | Tenders Electronic Daily (TED) ↗ |
Geprüft:
Die amtliche Bekanntmachung ist maßgeblich. Status und Bedingungen können sich nach der Erfassung ändern.
This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.
This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.