SprosRadar
Ausschreibungen finden
Tenders Electronic Daily (TED) · 777538-2026

Competitive procedure with negotiation concerning West Bridge Bearing Refurbishment (WBBR)

Eckdaten (Key Facts)

StatusVergeben
Geschätzter Wert42.500.000 €
AngebotsfristFrist nicht veröffentlicht
Veröffentlicht9. Nov. 2026
AuftraggeberA/S Storebælt
LandDänemark · København V
CPV-Code45221119, 44212120, 45221100, 45221110, 45223210, 45223500
QuelleTenders Electronic Daily (TED) ↗
Amtliche Bekanntmachung öffnen

Vergabeergebnis & aktuelle Alternativen

Die Angebotsfrist ist beendet. Die Originalbekanntmachung bleibt als Referenz verfügbar.

Auftragnehmer / GewinnerRegisternummer / LEILandVergebener VertragswertZuschlagsdatum
MT Højgaard Danmark A/S
Knud Højgaards Vej 7, Søborg, 2860
sas@mth.dk · +45 70122400
DK-REG: 12562233Dänemark39.789.644 €20. Okt. 2026

Offene Ausschreibungen in dieser CPV-Abteilung (CPV 45000000 · CPV × Land Zuschlagsmatrix)

Schwellenwerte, Fristen & Benchmarks prüfen

Geprüft:

Die amtliche Bekanntmachung ist maßgeblich. Status und Bedingungen können sich nach der Erfassung ändern.

Beschreibung

The Contracting Entity calls for the tender for West Bridge Bearing Refurbishment (WBBR). The project involves refurbishment of 188 structural bearings on the West Bridge, which is part of the Great Belt Link in Denmark. The work includes both the provision of newly manufactured bearings (approx. 44) and the renovation of the remaining bearings over a period of maximum 5 years. The project involves two parallel concrete bridges – one for rail and one for road. The bridges have now been in service for well over 25 years and the service life of the PTFE sliding plates in the bearings are now close to the end of expected lifetime. The project comprises of substantial work above open waters and includes the handling of structural bearings with a weight between 5 and 8 tonnes. The work also includes design and manufacturing of temporary structures necessary to carry out the refurbishments, according to a concept developed by the Contractor. The bearings needing renovation will have to be taken to land for refurbishment. Pursuant to section 49 of the Danish Public Procurement Act, the Contracting Entity has further considered whether the Contract can be divided into other lots but has found it most appropriate not to make such a division. It is the Contracting Entity's assessment that dividing the Contract into lots would result in disproportionate administrative burdens, both in relation to the synergies, the tender process and in relation to ongoing contract management, including the ongoing management of the tasks under the Contract.

Lose

  1. Competitive procedure with negotiation concerning West Bridge Bearing Refurbishment (WBBR)

    The Contracting Entity calls for the tender for West Bridge Bearing Refurbishment (WBBR). The project involves refurbishment of 188 structural bearings on the West Bridge, which is part of the Great Belt Link in Denmark. The work includes both the provision of newly manufactured bearings (approx. 44) and the renovation of the remaining bearings over a period of maximum 5 years. The project involves two parallel concrete bridges – one for rail and one for road. The bridges have now been in service for well over 25 years and the service life of the PTFE sliding plates in the bearings are now close to the end of expected lifetime. The project comprises of substantial work above open waters and includes the handling of structural bearings with a weight between 5 and 8 tonnes. The work also includes design and manufacturing of temporary structures necessary to carry out the refurbishments, according to a concept developed by the Contractor. The bearings needing renovation will have to be taken to land for refurbishment. Pursuant to section 49 of the Danish Public Procurement Act, the Contracting Entity has further considered whether the Contract can be divided into other lots but has found it most appropriate not to make such a division. It is the Contracting Entity's assessment that dividing the Contract into lots would result in disproportionate administrative burdens, both in relation to the synergies, the tender process and in relation to ongoing contract management, including the ongoing management of the tasks under the Contract.

    42.500.000 €

Öffentliche Geschäftskontakte

lhi@sbf.dk

+45 33416247

Geprüft: