Public Toilet Refurbishment
Auftraggeber: Winchcombe Town Council
100.000 £
Offen
Angebotsfrist: 20. Jan. 2027, 12:00 UTC
| Status | Vergeben |
|---|---|
| Geschätzter Wert | 213.580,59 £ |
| Angebotsfrist | Frist nicht veröffentlicht |
| Veröffentlicht | 25. Nov. 2026 |
| Auftraggeber | University of Sunderland |
| Land | Vereinigtes Königreich · Sunderland |
| CPV-Code | 45453100 |
| Quelle | Find a Tender ↗ |
Die Angebotsfrist ist beendet. Die Originalbekanntmachung bleibt als Referenz verfügbar.
| Auftragnehmer / Gewinner | Registernummer / LEI | Land | Vergebener Vertragswert | Zuschlagsdatum |
|---|---|---|---|---|
| Vest Construction (LIVECO) Ltd Bishop Auckland | GB-COH: 05286542 | Vereinigtes Königreich | 213.580,59 £ | 10. Aug. 2026 |
Auftraggeber: Winchcombe Town Council
100.000 £
Offen
Angebotsfrist: 20. Jan. 2027, 12:00 UTC
Auftraggeber: VIA EAST MIDLANDS LIMITED
20.000.000 £
Offen
Angebotsfrist: 15. Jan. 2027, 11:00 UTC
Auftraggeber: Forestry Commission
150.000 £
Offen
Angebotsfrist: 5. Jan. 2027, 12:00 UTC
Auftraggeber: Bristol City Council
60.000 £
Offen
Angebotsfrist: 24. Dez. 2026, 12:00 UTC
Geprüft:
Die amtliche Bekanntmachung ist maßgeblich. Status und Bedingungen können sich nach der Erfassung ändern.
The project will deliver a comprehensive refurbishment of the male and female changing areas, team changing rooms, shower facilities and associated WCs. Works include replacement of flooring, ceilings, lighting, sanitaryware, shower installations, cubicles, vanity units, locker doors and hand dryers, alongside full redecoration and upgrades to changing room furnishings. The scope also extends to the refurbishment of two assisted shower rooms and an assisted WC adjacent to the main changing areas.
Cityspace male and female changing spaces which include the WC's, shower facilities and changing spaces, also incorporating the home and away teams changing spaces. The works will consist of the replacement of all flooring, suspended ceilings, lighting, full redecoration, WC cubicles, WC wash hand basins, toilet pans and urinals, shower units, installation of new shower cubicles, installation of new vanity units, which will include large mirrors, fixed hair dryers, and power sockets for electric beauty products, new locker doors, a refresh of the changing room benches, new electric hand driers and full length mirrors.
Works also included within the City Space works is the replacement of floor finishes and redecoration to the two assisted shower rooms and the assisted WC within the corridor outside of the main changing rooms.