Public Toilet Refurbishment
Auftraggeber: Winchcombe Town Council
100.000 £
Offen
Angebotsfrist: 20. Jan. 2027, 12:00 UTC
| Status | Frühere Veröffentlichung |
|---|---|
| Geschätzter Wert | 1.250.000.000 £ |
| Angebotsfrist | Frist nicht veröffentlicht |
| Veröffentlicht | 13. Nov. 2026 |
| Auftraggeber | North London Waste Authority |
| Land | Vereinigtes Königreich · Tottenham Hale |
| CPV-Code | 45222100, 42320000, 45200000, 51135110 |
| Quelle | Find a Tender ↗ |
Für dieses Verfahren liegt eine neuere Veröffentlichung vor. Neueste Veröffentlichung öffnen →
| Auftragnehmer / Gewinner | Registernummer / LEI | Land | Vergebener Vertragswert | Zuschlagsdatum |
|---|---|---|---|---|
| Acciona Industrial S.A. C/ Mesena N. 80, Madrid, 28033 | GB-COH: FC039302 | Spanien | 1.250.000.000 £ | 12. Nov. 2026 |
Auftraggeber: Winchcombe Town Council
100.000 £
Offen
Angebotsfrist: 20. Jan. 2027, 12:00 UTC
Auftraggeber: VIA EAST MIDLANDS LIMITED
20.000.000 £
Offen
Angebotsfrist: 15. Jan. 2027, 11:00 UTC
Auftraggeber: Forestry Commission
150.000 £
Offen
Angebotsfrist: 5. Jan. 2027, 12:00 UTC
Auftraggeber: Bristol City Council
60.000 £
Offen
Angebotsfrist: 24. Dez. 2026, 12:00 UTC
Geprüft:
Die amtliche Bekanntmachung ist maßgeblich. Status und Bedingungen können sich nach der Erfassung ändern.
Energy Recovery Facility Construction Works for the North London Heat & Power Project ("NLHPP") - Agreement dated 24 January 2022 as previously amended by Variation Agreement No. 1 dated 27 June 2023 and Variation Agreement No. 2 dated 26 July 2026. It is proposed to further amend the Contract by way of a draft Settlement and Variation Agreement No. 3 intended to be signed on 14 December 2026
NLWA intends to award an amended contract to Acciona Industrial S.A. in respect of the design, procurement, construction commissioning and testing of an Energy from Waste facility known as the Energy Recovery Facility ("ERF") at Edmonton EcoPark, Advent Way, Edmonton London N18 3AG including all associated buildings, infrastructure and landscaping works at its Edmonton EcoPark site in Edmonton, London N18 3AG in relation to the NLHPP (the "Contract"). The Contract also includes training of operational staff by the contractor. The NLHPP is a programme of works to be carried out for the Authority at its 'EcoPark' site, in Edmonton, London N18 3AG. The works are the fundamental component in the delivery of the NLHPP and associated works at the Edmonton EcoPark pursuant to a development consent order granted to the Authority on 24 February 2017.
The ERF has already been partially completed pursuant to the underlying Contract with Acciona Industrial S.A, which is an amended IChemE Form of Contract for Lump Sum Contracts ("Red Book" form), amended by a schedule of Special Conditions on 24 January 2022. The Contract has been amended twice previously by Variation Agreement (No. 1) dated 27 June 2023 and Variation Agreement (No. 2) dated 26 July 2026. It is proposed to further amend the Contract by way of a draft Settlement and Variation Agreement (No. 3) that is appended to this notice along with other Contract documents that show the proposed modifications to the Contract.
The Authority is seeking a contractor to design and construct the following works: (i) the ERF that consists of two identical process lines each comprising moving grate combustion unit, heat recovery boiler, combined flue gas treatment system incorporating selective catalytic reduction, a common turbine-generator/condensing system and all associated auxiliary systems; (ii) all civil engineering, buildings, architectural treatment, utilities connection, landscaping and other site works; (iii) ERF Weighbridges and ancillary offices; (iv) transport offices, workshops and parking for on-site operational vehicles; (v) vehicle wash; (vi) administration/operations offices and staff facilities; (vii) windshield and flues; (viii)) cooling condensers; (ix) raw water pre-treatment plant; (x) ERF Fire Water Tank and associated fire protection systems; (xi) electrical substation, works and connections; (xii) gas compound, works and connections; (xiii) other utility connections including communications and water; (xiv) workshops, stores and maintenance contractors area; and (xv) wastewater treatment plant and associated works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the new ERF including all buildings, infrastructure and works. The contractor shall deliver all design, engineering, procurement, construction, commissioning, testing, operator training and handover requirements for the ERF including all associated buildings, infrastructure and landscape works. The contractor shall comply with the requirements of the CDM Regulations 2015 in relation to the roles of the Principal Contractor and Principal Designer for this Contract. The Authority may require the Contractor to provide operational services during the Defects Liability period. Further details of the required works are set out in the procurement documents. The Memorandum of Information provides background informa